MSHA silica rule: compliance deadlines stayed
The U.S. Mine Safety and Health Administration finalized new silica protections in 2024, but the compliance deadlines remain stayed. MSHA's November 2026 proposal restates the stay and would revise sampling, respiratory protection and medical surveillance while keeping the 50 µg/m³ PEL and 25 µg/m³ action level.
The original coal and metal/nonmetal deadlines are stayed and no replacement date has been set. Stay status comes from agency notices, and the court docket needs confirmation before operational reliance.
- Legal status
- Final rule; compliance deadlines stayed; conforming amendments indefinitely delayed
- Source check
- Nov 11, 2026
- Topic
- Respirable crystalline silica
What changed
Previous requirement
Existing mine silica and respiratory-protection standards; MNM sections 56.5001/5005 and 57.5001/5005 remain enforced during stay.
New requirement or current position
Finalized part 60 sets 50 microgram/m3 PEL, 25 microgram/m3 action level, monitoring, controls, surveillance and updated respiratory protection, but stayed deadlines must not be shown as currently due.
Who it affects
- Mining
- Aggregates
- Metal/nonmetal mines
- Coal mines
Dates and milestones
Commencement and compliance dates can differ. Read the conditions beside each date, including any stay or local adoption requirement.
- Announcement or publication
- Apr 18, 2024
- Recorded effective date
- Jun 17, 2024
Coal mine operators
Original deadline; STAYED, not a current due date.
Metal and nonmetal mine operators
Original deadline; STAYED, not a current due date.
Replacement compliance date
Not established in checked sources.
Selected exposure values
These values need the scope, limit type and averaging period shown below. A proposed or advisory value is not a binding limit.
Respirable crystalline silica
50 µg/m³| Averaging period | Full shift, 8-hour TWA |
|---|---|
| Limit type | Finalized PEL; stayed compliance |
| Scope | All miners under 2024 rule |
Respirable crystalline silica
25 µg/m³| Averaging period | Full shift, 8-hour TWA |
|---|---|
| Limit type | Finalized action level; stayed compliance |
| Scope | All miners under 2024 rule |
What this could mean for your IH program
Advisory interpretation: Keep old and finalized limit sets distinct. Do not generate overdue alerts from stayed deadlines. Continue to assess applicable existing mine standards.
Confirm applicability with a qualified practitioner before changing your program.
Questions and qualifications
- Court docket was not independently retrieved (PACER login required). Stay status rests on agency sources: the April 2026 notice, the August 2026 agenda and MSHA's November 2026 proposal (91 FR 73064). Refresh court and Federal Register before operational reliance.
- The MSHA silica rulemaking web page still describes the original compliance periods and does not mention the stay or the November 2026 proposal.
- Pending proposal US-MSHA-SILICA-NPRM-2026 would change monitoring, respirator, medical surveillance and recordkeeping provisions of this rule if finalized.
Source evidence
- Respirable Crystalline Silica
MSHA · Final Rule bullets
2024 rule specifies a 50 microgram/m3 PEL and 25 microgram/m3 action level as full-shift 8-hour TWAs, monitoring, medical surveillance and ASTM F3387-19 respiratory protection.
- Silica: delay of effective date of conforming amendments
MSHA / Federal Register · 91 FR 17143-17144; Dates; Background; Indefinite Delay
April 11, 2025 Eighth Circuit stay covers compliance deadlines. April 6, 2026 notice indefinitely delays conforming amendments; existing 56.5001, 56.5005, 57.5001 and 57.5005 remain enforced.
- 2026 Unified Agenda
Federal Register / MSHA · Printed p.52892, entry 102, RIN 1219-AC22; PDF p.101
August 14, 2026 agenda still describes silica enforcement as paused and plans revisions to monitoring, compliance, respirators and surveillance; agenda dates are estimates, not enacted deadlines.
- Respirable Crystalline Silica and Respiratory Protection: full text
MSHA / Federal Register · 91 FR 73063 (section I); 91 FR 73064 (II.B Regulatory History); 91 FR 73067-73073 (IV.A.2 sampling); 91 FR 73074 and 73082 (respiratory protection); 91 FR 73076-73077 (medical surveillance); 91 FR 73079 (5005T delay); 91 FR 73130-73132 (regulatory text)
MSHA does not propose changing the 50 µg/m³ PEL or 25 µg/m³ action level (full-shift, 8-hour TWA). Proposed 60.12(d)(3) applies a 21 percent error factor to MSHA and operator samples; 60.12(d)(4) bases PEL citations on a single full-shift MSHA sample. Sampling would be required as frequently as necessary for miners reasonably expected at or above the action level. 29 CFR 1910.134 would be adopted by reference in place of ASTM F3387-19. The Eighth Circuit stay of April 11, 2025 continues and MSHA continues to temporarily pause enforcement. Section 60.1 compliance dates are not amended.
Managing your IH program
Explore how LEAP IH supports industrial hygiene data management and risk assessment.
Explore LEAP IHSee a missing update or a correction? Contact APT with this page and the official source.