Regulatory trackerCoverage and methodology
All findings
United States · CaliforniaDraft

California discusses prohibition on high-silica artificial stone

Cal/OSHA posted an updated discussion draft on October 22, 2026 for an emergency rule banning the manufacture and fabrication of artificial stone slabs or panels containing 1.0% or more crystalline silica. The draft adds an installation ban 360 days after the rule's effective date and an artificial stone action level of 10 µg/m³ as an 8-hour TWA.

Scope to keep in mind

These are draft terms with no Board adoption or effective date. Current section 5204 and SB 20 duties apply in the meantime.

Legal status
Pre-adoption discussion draft; not an enacted ban
Source check
Nov 18, 2026
Topic
Artificial stone / silica

What changed

Previous requirement

Current section 5204 remains applicable.

New requirement or current position

October 22, 2026 draft (proposal only): new 5204.1 would prohibit manufacture and fabrication of artificial stone slabs or panels containing 1.0% or more crystalline silica 60 days after an OAL effective-date placeholder, with a sell-through exception ending at 180 days; amended 1532.3(a)(3) would prohibit installation at 360 days, keeping an exception for onsite maintenance and repair; each SKU would need an SDS and accredited X-ray diffraction analysis or be treated as covered; amended 5204 would define an artificial stone action level of 10 µg/m³ respirable crystalline silica as an 8-hour TWA for high-exposure trigger tasks on artificial stone or mixed slabs (the September 16 draft used 3.0 µg/m³). The September 16 draft exempted installation.

Who it affects

  • Artificial-stone fabrication
  • Construction installation

Dates and milestones

Commencement and compliance dates can differ. Read the conditions beside each date, including any stay or local adoption requirement.

Announcement or publication
Sep 16, 2026
Recorded effective date
Not established or not applicable
Sep 30, 2026

Interested commenters

Comment date on the September 16, 2026 draft (historical). NOT an employer compliance deadline.

Oct 30, 2026

Interested commenters

Comment date on the October 22, 2026 updated draft. NOT an employer compliance deadline.

What this could mean for your IH program

Advisory interpretation: Monitor Board adoption and final scope before treating a material threshold as a prohibition or the draft action level as a requirement. Current section 5204 and SB 20 duties apply in the meantime.

Confirm applicability with a qualified practitioner before changing your program.

Questions and qualifications

  • The October 22 draft body is internally inconsistent in places (some lines read more than 1.0% or more); quote the title for the threshold.
  • The 10 µg/m³ action level is read from strikethrough and underline formatting in the .docx (3.0 struck, 10 underlined); confirm against any rendered agency version. It is a draft value and is not entered in numerical_limits.
  • An emergency regulation would need Board adoption and OAL approval. No Board agenda item on this topic was found for September 17, October 15 or November 19, 2026. Comments received by October 30, 2026 were not reviewed.
  • Historical: the September 17, 2026 check could not load the draft; both drafts are posted as .docx files and were read on November 11, 2026.

Source evidence

  1. Emergency silica rulemaking advisory meetings

    Cal/OSHA · October 22, 2026 and September 16, 2026 entries

    Posts the September 16, 2026 discussion draft (comments September 30) and the October 22, 2026 updated draft (comments October 30). No adoption or effective date listed.

  2. Updated discussion draft, October 22, 2026

    Cal/OSHA · Proposed 5204.1 heading and (a)-(f); 5204(b) definition (3); 1532.3(a)(2)-(3)

    Titled Prohibition of the Manufacture and Fabrication of Artificial Stone Slabs or Panels Containing 1.0% or More Crystalline Silica. Manual strikethrough and underline formatting (not Word tracked changes) strikes 3.0 and inserts 10 µg/m³, 8-hour TWA, for the artificial stone action level. Installation prohibited at the OAL placeholder plus 360 days.

  3. Discussion draft, September 16, 2026

    Cal/OSHA · Proposed 5204(b) artificial stone action level definition

    Earlier draft set the artificial stone action level at 3.0 µg/m³ 8-hour TWA and exempted installation.

  4. Standards Board Advances Efforts to Protect Workers from Silicosis

    California DIR · May 22, 2026 release

    May 21 Board vote granted petition to initiate prohibition process; emergency rulemaking requested. This is not itself an enacted ban.

Managing your IH program

Explore how LEAP IH supports industrial hygiene data management and risk assessment.

Explore LEAP IH

See a missing update or a correction? Contact APT with this page and the official source.